Skip to main content

Finocket for Automobile manufacturing & assembly

Built for automobile manufacturing & assembly

An assembly line where the BOM is the costing - chassis, motor, controller, battery pack, body - routed through welding, paint, assembly and end-of-line testing, and every vehicle leaving the plant carrying its own VIN from the work order to the dealer's invoice.

  • 8 day-to-day use cases written for automobile manufacturing & assembly
  • 38 modules on the Suite plan
  • How we compare

Sample business: Chakra EV Motors - a demo automobile manufacturing & assembly workspace in Ludhiana, Punjab

A Ludhiana EV plant where every vehicle carries its VIN from the line

Before: Assembly cost estimated per model, VINs typed onto dealer invoices, and spares billed at a different rate from vehicles.

With Finocket: Each model's BOM is its cost; routing adds line labour; each vehicle produced gets its VIN and is sold against it; each line at the rate set on the item.

On the day-to-day

What automobile manufacturing & assembly businesses do in Finocket

  • The bill of materials is the costing

    Open the E-Rickshaw Passenger (L3) BOM: raw materials and routing roll up into one cost per unit of e-rickshaws.

  • A work order from plan to finished stock

    One draft, one in progress, one completed - start a draft and walk it through its routing steps.

  • Production consumes raw, yields finished

    A completed run: raw material out, finished goods in at the rolled-up cost, labour from the work centres included.

  • Capacity by work centre

    Which work centre is the bottleneck this week, from the open work orders' routing minutes.

  • Every vehicle has a VIN

    Open the L3 model: VINs produced by each run, in stock at the yard or sold on a dealer invoice.

  • Vehicle and spare on one return

    GSTR-1 carries vehicle and spare battery pack lines, each at the rate set on the item.

  • Powder coating is a step done outside

    The L5 routing sends the welded frame to Focal Point Powder Coaters, set up as an outside work centre with its own rate and daily minutes.

  • Job-work bills as their own expense line

    The powder coater's bills booked under Job Work - Powder Coating, the contractor payment TDS 194C applies to.

Ready to run your automobile manufacturing & assembly business on Finocket?

Free for solo users until 31 Dec 2026 — no partner code needed. ₹99/month after that. No credit card. Your books stay yours.